What We've Done

PROJECTS

Some of our favorites...

SB Contractors-585.jpg

Old Gregg Ln.

Completed: August 2020

Demo of Existing Bridge Structure

Bridge Reconstruction

Three Span 180 LF

TX 28 Girders

Reverse Curve Design

Relocation of Utilities & Bore Under Creek

TXDot%2520CR14%2520Lavaca%2520Co%25203_e

Lavaca Co.

Completed: April 2019

Bridge Reconstruction

Two Span 130 LF

36" Slurry Shafts

Abutments

Columns

TX 40 Beams

pic%201%20(2)_edited.jpg

San Marcos River Path

Completion Date: December 2020

3,650 LF of 10' Wide Trail

106 LF Prefabricated Pedestrian Bridge

Colored Textured Concrete

8,000 LF of Quarried Limestone Blocks

Environmentally Sensitive Area

Barbara Dr Drainage Project City of San

Barbara Dr.

Completed: July 2018

100,000 CY Excavation

Reinforced Concrete Lining with Drainage

Water and Sewer Improvements

1,064 LF of 10'x12' Box Culverts

Sidewalk and Lighting Improvements

Victoria%20Co%20Raab%20Rd_edited.jpg

Victoria Co.

October 2019

Reconstruction of Three Bridges

  • Single Span 50 LF Slab Beam Bridge

  • Three Span 125 LF Slab Beam Bridge

  • Single Span 50 LF Slab Beam Bridge

pic 2.jpg

Dewitt Co.

Completed: January 2020

Demo of Existing Bridge Structure

Bridge Reconstruction

Three Span 558 LF

Steel Girders

Completed 20 Days Early

Travis Co Turnersville.jpg

Turnersville Rd.

Completed: September 2018

Bridge Reconstruction

Single Span 60 LF

TX 28 Girders

Lined Channel w/ 18" Stone Riprap

Wharton%20Co%20CR%20455%20After_edited.j

Wharton Co.

Completed: October 2019

Reconstruction of Four Bridges

  • Five Barrel 10'x7' MBC (26 LF)

  • Two Span 80 LF Slab Beam Bridge

  • Single Span 40 LF Slab Beam Bridge

  • Five Barrel 10'x9' MBC

 

pic 1 (4).jpg

Travisso

Completed: December 2020

Bridge Construction

Two Span 180 LF

TX 40 Concrete Girders

2,500 SQ FT of Sidewalk Bridge

384 LF of C411 Rail