What We've Done
PROJECTS
Some of our favorites...

Old Gregg Ln.
Completed: August 2020
Demo of Existing Bridge Structure
Bridge Reconstruction
Three Span 180 LF
TX 28 Girders
Reverse Curve Design
Relocation of Utilities & Bore Under Creek

Lavaca Co.
Completed: April 2019
Bridge Reconstruction
Two Span 130 LF
36" Slurry Shafts
Abutments
Columns
TX 40 Beams
_edited.jpg)
San Marcos River Path
Completion Date: December 2020
3,650 LF of 10' Wide Trail
106 LF Prefabricated Pedestrian Bridge
Colored Textured Concrete
8,000 LF of Quarried Limestone Blocks
Environmentally Sensitive Area

Barbara Dr.
Completed: July 2018
100,000 CY Excavation
Reinforced Concrete Lining with Drainage
Water and Sewer Improvements
1,064 LF of 10'x12' Box Culverts
Sidewalk and Lighting Improvements

Victoria Co.
October 2019
Reconstruction of Three Bridges
-
Single Span 50 LF Slab Beam Bridge
-
Three Span 125 LF Slab Beam Bridge
-
Single Span 50 LF Slab Beam Bridge

Dewitt Co.
Completed: January 2020
Demo of Existing Bridge Structure
Bridge Reconstruction
Three Span 558 LF
Steel Girders
Completed 20 Days Early

Turnersville Rd.
Completed: September 2018
Bridge Reconstruction
Single Span 60 LF
TX 28 Girders
Lined Channel w/ 18" Stone Riprap

Wharton Co.
Completed: October 2019
Reconstruction of Four Bridges
-
Five Barrel 10'x7' MBC (26 LF)
-
Two Span 80 LF Slab Beam Bridge
-
Single Span 40 LF Slab Beam Bridge
-
Five Barrel 10'x9' MBC
.jpg)
Travisso
Completed: December 2020
Bridge Construction
Two Span 180 LF
TX 40 Concrete Girders
2,500 SQ FT of Sidewalk Bridge
384 LF of C411 Rail