What We've Done

PROJECTS

Some of our favorites...

SB Contractors-585.jpg

Old Gregg Ln.

Completed: August 2020

Demo of Existing Bridge Structure

Bridge Reconstruction

Three Span 180 LF

TX 28 Girders

Reverse Curve Design

Relocation of Utilities & Bore Under Creek

TXDot%2520CR14%2520Lavaca%2520Co%25203_e

Lavaca Co.

Completed: April 2019

Bridge Reconstruction

Two Span 130 LF

36" Slurry Shafts

Abutments

Columns

TX 40 Beams

pic%201%20(2)_edited.jpg

San Marcos River Path

Completion Date: December 2020

3,650 LF of 10' Wide Trail

106 LF Prefabricated Pedestrian Bridge

Colored Textured Concrete

8,000 LF of Quarried Limestone Blocks

Environmentally Sensitive Area

​

Barbara Dr Drainage Project City of San

Barbara Dr.

Completed: July 2018

100,000 CY Excavation

Reinforced Concrete Lining with Drainage

Water and Sewer Improvements

1,064 LF of 10'x12' Box Culverts

Sidewalk and Lighting Improvements

​

Victoria%20Co%20Raab%20Rd_edited.jpg

Victoria Co.

October 2019

Reconstruction of Three Bridges

  • Single Span 50 LF Slab Beam Bridge

  • Three Span 125 LF Slab Beam Bridge

  • Single Span 50 LF Slab Beam Bridge

​

​

pic 2.jpg

Dewitt Co.

Completed: January 2020

Demo of Existing Bridge Structure

Bridge Reconstruction

Three Span 558 LF

Steel Girders

Completed 20 Days Early

​

Travis Co Turnersville.jpg

Turnersville Rd.

Completed: September 2018

Bridge Reconstruction

Single Span 60 LF

TX 28 Girders

Lined Channel w/ 18" Stone Riprap

​

​

Wharton%20Co%20CR%20455%20After_edited.j

Wharton Co.

Completed: October 2019

Reconstruction of Four Bridges

  • Five Barrel 10'x7' MBC (26 LF)

  • Two Span 80 LF Slab Beam Bridge

  • Single Span 40 LF Slab Beam Bridge

  • Five Barrel 10'x9' MBC

 

pic 1 (4).jpg

Travisso

Completed: December 2020

Bridge Construction

Two Span 180 LF

TX 40 Concrete Girders

2,500 SQ FT of Sidewalk Bridge

384 LF of C411 Rail

​